The County of Bruce has retained BT Engineering Inc. to undertake an Environmental Assessment (EA) Study and Detail Design for the rehabilitation of Bruce Road 6 East A.
The project extends from George Street in Mildmay to Grey Road 10 and includes two bridges.
The study has investigated the roadway design and is recommending a preferred plan to address the traffic needs within the project area
Phase 1 of construction is proposed from Mildmay to Deemerton including reconstruction of Sideroad 20. Phase 1 is tentatively scheduled for construction in 2022/2023.
Phase 2 from east of Sideroad 20 to Grey Road 10. is tentatively scheduled for construction in 2026/2027.
An online Public Information Centre is underway over two-weeks and a “live” virtual Zoom meeting will take place on November 24, 2021, from 6:30 to 8:00 PM
Head to www.brucecounty.on.ca/bruce-road-6-east for more information.